Our Work

Altha Public School
Altha, FL
  • RAY_6780_front

    https://h2engineering.com/wp-content/uploads/2017/05/RAY_6780_front.jpg

    ray6780front
  • RAY_6881_gym

    https://h2engineering.com/wp-content/uploads/2017/05/RAY_6881_gym.jpg

    ray6881gym
  • RAY_6960_cafet

    https://h2engineering.com/wp-content/uploads/2017/05/RAY_6960_cafet.jpg

    ray6960cafet
  • RAY_7029_library

    https://h2engineering.com/wp-content/uploads/2017/05/RAY_7029_library.jpg

    ray7029library
  • RAY_7053_classroom

    https://h2engineering.com/wp-content/uploads/2017/05/RAY_7053_classroom.jpg

    ray7053classroom
  • RAY_7068_classroom

    https://h2engineering.com/wp-content/uploads/2017/05/RAY_7068_classroom.jpg

    ray7068classroom
  • RAY_7083_hall

    https://h2engineering.com/wp-content/uploads/2017/05/RAY_7083_hall.jpg

    ray7083hall
Previous Image
Next Image

info heading

info content


Project Name: Altha Public School
Location: Altha, FL
Project Cost: 26,133,135
Building Area: 13,747

Description

This 130,747 SF project consisted of the demolition of existing classroom buildings, renovation of two classroom buildings and new construction on an existing campus. The facility sits on a 22-acre site providing ample parking and multiple covered bus drop and student/parent drop-off areas around the school. The campus is arranged in a courtyard design with four core buildings and five classroom buildings that are connected by a series of sidewalks and covered walkways. The Administration, Gymnasium, and Cafetorium comprise the front of the school. The Administration building houses offices, teacher support areas, conference rooms and a 4-bed clinic. The Cafetorium is a multi-purpose space, serving as a dining facility as well as an auditorium. The Gymnasium contains the gym and additional athletic spaces for weight lifting, wrestling, gymnastics, and dance. The Media building features a closed circuit television studio, computer stations, and a large reading and stack room. The classroom buildings contain 12 primary classrooms, 11 intermediate classrooms, and 4 ESE classrooms. Also included are 4 resource rooms, 2 ESE resource rooms, 7 skills development classrooms and labs, 2 music classrooms, and 2 art classrooms. This facility was developed by the reuse of plans from the Poplar Springs K-8 School in Bonifay, Florida. Approximately 40,000 SF of this facility is designated for use as an Enhanced Hurricane Protection Area (EHPA).

Services Provided

  • HVAC
  • Fire Protection
  • Plumbing
  • Electrical
  • Telecommunications
  • Security
  • Construction Administration

Owner

Calhoun County School District

Architect

Clemons Rutherford & Associates

Contractor

Allstate Construction, Inc. & Southland