Our Work

City of Tallahassee Electric & Gas Utility Logistics Facility
Tallahassee, FL
  • COTELF_6a

    https://h2engineering.com/wp-content/uploads/2022/07/COTELF_6a.jpg

    cotelf6a
  • COTELF_1a

    https://h2engineering.com/wp-content/uploads/2022/07/COTELF_1a.jpg

    cotelf1a
  • COTELF_2a

    https://h2engineering.com/wp-content/uploads/2022/07/COTELF_2a.jpg

    cotelf2a
  • COTELF_3a

    https://h2engineering.com/wp-content/uploads/2022/07/COTELF_3a.jpg

    cotelf3a
  • COTELF_4a

    https://h2engineering.com/wp-content/uploads/2022/07/COTELF_4a.jpg

    cotelf4a
  • COTELF_5a

    https://h2engineering.com/wp-content/uploads/2022/07/COTELF_5a.jpg

    cotelf5a
  • COTELF_1a

    https://h2engineering.com/wp-content/uploads/2022/07/COTELF_1a-1.jpg

    cotelf1a
Previous Image
Next Image

info heading

info content


Project Name: City of Tallahassee Electric & Gas Utility Logistics Facility
Location: Tallahassee, FL
Project Cost: $2,300,000
Building Area: 7,676

Description

The City of Tallahassee’s Electric and Gas Utility Department built this facility to be used primarily during an emergency or disaster as a safe haven for personnel and continued operations and was designed to withstand 200 MPH winds. The secondary purpose of the facility is to provide a large meeting space where clients can hold training and other activities for large groups. The large main dining room and meeting area can seat up to 414 people and has a kitchen that can accommodate up to 380 people for meals. Support spaces include ample table and chair storage, restrooms, and a catering area. The building area includes 7,676 square feet of conditioned dining and support spaces, and 2,766 square feet of exterior covered area to accommodate catering and delivery trucks.

Services Provided

  • Mechanical
  • Electrical
  • Plumbing
  • Fire Protection
  • Construction Administration

Owner

City of Tallahassee

Architect

BKJ Architecture, Inc.